Laboratory Name | Major Facilities | Lab In-charge | Total Investment | Carpet Area in sq. M. |
Automotive Research & Diagnosis Center | Vehicle Diagnosis System Data Acquisition system On road Vehicle Performance test setup | Dr. S. R. Desai | 51,18,677=00 | 100 |
Automobile Power Plant | Computerized Engine Testing Facility | Prof. S. T. Satpute | 31,22,043=00 | 200 |
Automobile Maintenance |
* Computerized Wheel Alignment, Balancing setup,
* Well equipped service station |
Prof. R. M. Shinde | 11,62,994=00 | 125 |
Automotive Transmission |
* Transmission Gear-Box performance testing
* Epicyclic gear train holding torque apparatus * Power tiller with harvester mechanism |
Prof. Y. S. Patil | 11,39,167=00 | 195 |
Automobile Emission | Authorized PUC Centre | Dr. L. M. Jugulkar | 6,78,940=00 | 60 |
Automobile Electrical & Electronics | Testing Automotive Electrical Systems | Dr. S. R. Patil | 15,78,801=00 | 195 |
Automobile Body Engineering |
* Ergonomic Test Setup for Driver
* AC Motor with AC Drive and control Panel * Wind Tunnel * Open Circuit Wind Tunnel with sonic speed of 30 m/s.
* Test section with 300mm X 300mm X 1000mm. * 5 HP, D.C. Shunt Motor, 1500 rpm, 230/460 V
* 3-φ, Variable speed Controller (Motor Controller)
|
Prof. S. G. Kumbhar | 1,31,14,708=00 | 120 |
Automobile Chassis | Demonstrative Setup for all Automotive Systems. MR brake test rig. |
Prof. S. S. Mane | 6,36,612=00 | 120 |
Fuels & Combustion | Fuel testing Facility. | Prof. A. T. Suryawanshi | 3,39,382=00 | 100 |
P G Lab | Vehicle Diagnosis System Data Acquisition system On road Vehicle Performance test setup | Dr. S. D. Yadav | 20,15,562=00 | 75 |
Department Software Lab | License Softwares. | Prof. P. S. Ghatage | 15,87,074=00 | 50 |
Post Graduate Software Lab | License Softwares. | Prof. P. S. Ghatage | 26,02,367=00 | 50 |
Department Software Lab 1 | License Softwares. | Prof. P. S. Ghatage | 9,58,040=00 | 60 |
Department Computer Lab | Internet facility and License Softwares. | Prof. P. S. Ghatage | 8,78,437=00 | 100 |
Project Lab | Drilling machine, battery charger, Driver’s Suit | Prof. S. Y. Sawant | 8,78,437=00 | 100 |
Lab Name | Total Investment |
Mechanical Measurement & Control | 6,26,102=00 |
Thermodynamics [With Steam Power Plant] | 13,94,659=00 |
Metrology & Quality Control | 8,13,644=00 |
Fluid Mechanics & Machinery | 5,37,835=00 |
Theory of Machines | 4,19,020=00 |
Metallurgy | 15,90,306=00 |
Heat & Mass Transfer | 4,11,600=00 |
Refrigeration & Air Conditioning Lab | 6,15,556=00 |
Industrial Hydraulics & Pneumatics | 33,64,641=00 |
Foundry Engineering | 63,316=00 |
* ARDC is shared with PG ARC Lab.
MAJOR EQUIPMENT IN LABORATORY
Sr.No. | Name of the Equipment | Total Cost (Rs.) |
1 | Two Wheeler Chassis Dynamometer | 8,43,750=00 |
2 | Computerized Multi Cylinder Diesel Engine Test Setup | 8,20,771=00 |
3 | ITI Simulation Software | 3,12,000=00 |
4 | Data Acquisition System | 8,42,400=00 |
5 | Decelerometer | 5,51,200=00 |
6 | Combustion Analyzer | 9,77,600=00 |
7 | BSWA Microphone-MPA205 | 65,250=00 |
8 | Water Flow Control Valve Set with PID Controller & I to P Converter | 1,50,357=00 |
9 | Flow Meter with Single Splitter for control valves | 69,019=00 |
10 | Miniature accelerometer [8778A] | 64,034=00 |
11 | Reciprocating Air Compressor [15 HP] | 1,57,500=00 |
12 | Signal Conditioner [DAQP-STG-D] | 79,380=00 |
13 | Data Acquisition System (DEWE-50-USB-8) | 6,95,000=00 |
Lab Total | 56,28,261=00 |
---|
1 | Maruti Engine Test Rig | 86,230=00 |
a) Maruti Engine | ||
b) Eddy Current Dynamometer | ||
2 | Computerized I. C. Engine Test Rig with Kirloskar Diesel Engine and Eddy Current Dynamometer | 6,23,700=00 |
3 | Two Wheeler Eddy Current Dynamometer with Dynamometer Controller | 3,08,318=00 |
4 | Engine Assembly w/o Eng. Mtg. (MPFI) | 1,23,000=00 |
5 | Electronic Fuel Measurement Unit | 90,000=00 |
6 | Cut section Model of Engine 4 valve overhead camshaft type | 86,700=00 |
Lab Total | 13,17,948=00 |
---|
1 | Wheel Balancing Machine | 65,665=00 |
2 | Double insulated electrically operated single phase high pressure washer with induction motor, Augatels 160 pressure 160 bar Flow rate 600 lit/min motor power = 3000w | 60,000=00 |
3 | Computerized Wheel Alignment Machine | 5,40,956=00 |
4 | Computerized Wheel Balancing Machine | 89,284=00 |
5 | Fuel Injector Cleaner & Tester (MCT-FY6C) | 1,01,531=00 |
6 | Engine Decarbonizing Machine | 64,125=00 |
( MCT-Royal DX) | ||
Lab Total | 9,21,561=00 |
1 | Auto. Electrical Test Bench | 1,03,220=00 |
2 | KTS 180 F002 D90 101 | 1,44,000=00 |
3 | LJ make DIGIAC 3000 Experiment Platform Study Module | 1,90,993=00 |
4 | LJ make Automotive Electrics Study Module | 94695=00 |
5 | LJ make Ignition System | 2,38,878=00 |
6 | LJ make Vehicle Display System Study Module | 1,03,201=00 |
7 | Hybrid Go-Kart | 82,300=00 |
8 | BLDC Motor 3000 W/48 VDC/2600 RPM | 56,911=00 |
9 | Solar Panel 200 Watt 12 Volt – 05 Nos. | 52,000=00 |
Lab Total | 10,66,198=00 |
1 | Gear Box Test Rig | 3,88,125=00 |
2 | Working Cut Section of Automobile Vehicle | 1,80,000=00 |
3 | Power tiller with harvester mechanism | 1,02,000=00 |
4 | Epicyclic Gear Train & Holding Torque Apparatus | 65,000=00 |
5 | CVT for Car | 62,420=00 |
6 | Automatic Manual Transmission (AMT) Gear Box | 51,084=00 |
Lab Total | 8,48,629=00 |
1 | Exhaust Gas Analyzer Tecalmint T. D. 2040. | 62,400=00 |
2 | Microprocessor Based 4 Gas Auto. Exhaust Analyzer Model – NPM-CH4 Sl. No. 011 | 1,89,000=00 |
3 | CO/HC Gas Analyzer Model – NPN-CH1 with printer (Sl. No. 954) | 97,811=00 |
4 | Smoke Meter | 1,03,922=00 |
Model – NPN-SM-111B with printer (Sl. No. 473) | ||
5 | Computer controlled System Engine Analyzer with Diesel Interface, 80 Column Printer (Engine Scanner) | 1,70,000=00 |
Lab Total | 6,23,133=00 |
1 | Wind Tunnel instrumentation | 55,000=00 |
2 | Experimental Test Set up for Driver Ergonomics | 1,24,800=00 |
3 | AC Motor with AC Drive and control Panel | 2,67,750=00 |
4 | Wind tunnel -Open type | 2,30,000=00 |
Lab Total | 6,77,550=00 |
1 | Jeep Willys chassis No. CJ3b47110596 Engine No. 053674SJ | 10,000=00 |
2 | cut-section model of complete both side macpharsen suspension AMA with drive shaft disc brake & rack pinion steering | 39,920=00 |
3 | Cut- Section of complete spring with both side suspension of two wheeler monoshock SNS, Coils Telescopic | 25,080=00 |
4 | Cut- Section Model of Complete Front Suspension with longitudinal bar | 25,100=00 |
5 | Cut- Section model of Coil type rear suspension | 25,100=00 |
6 | Cut- section of both side double wishbone front suspension | 25,100=00 |
7 | Cut-Section model of hydraulic brake with disc brake and driven brake & vacuum booster | 39,600=00 |
8 | Working Model of Air Brake System | 65,900=00 |
9 | Shock Absorber Testing Machine | 61,875=00 |
10 | Torque Sensor, Motor & Electrical Control Panel | 1,50,000=00 |
Lab Total | 6,36,612=00 |
1 | Multiple heat Exchanger Apparatus | 1,40,000=00 |
2 | Flow though Pipes in parallel & Series Condition | 77,000=00 |
Lab Total | 2,17,000=00 |
1 | Multi-gas Analyzer | 2,29,562=00 |
2 | Computerized Engine Test Set-Up for VCR Multifuel Engine with Eddy Current Dynamometer & E.P.A. Software | 10,49,250=00 |
3 | Gas Analyzer (AVL DITEST MDS-205) | 7,36,750=00 |
Lab Total | 20,15,562=00 | |
---|---|---|
Total | 1,35,52,704=00 |